The IDEA Platform

Innovations for Design, Engineering and Automation

4D Planning

Visual 3D construction and assembly sequences synched to schedule.

Digital Fabrication

Unifying BIM with manufacturing technology to build better.

Virtual & Mixed Reality

Immersive realistic experience for material and change management.

Laser Scanning

Exact spatial data of spaces and elements using reality capture.

Automation

Combining BIM data and robotics to build faster and safer.

Drone Surveys

Aerial reality capture and data-rich modeling.

MEP/BIM Coordination

Optimized BIM-based constructability review, mitigating risk before fabrication.

3D Printing

Redefining possibilities to build elements with BIM and additive manufacturing.

3D Site Logistics

Interactive 3D logistics and safety planning.

3D Maps

Interactive campus maps built with reality capture, GIS and BIM.

With our Innovations for Design, Engineering, and Automation (IDEA) platform, we are optimizing the use of BIM, digital prefabrication, drones, robotics, AR/VR, and reality capture to mitigate risks, increase efficiencies and bring our clients’ vision to life. Our tech first IDEA platform is a powerful catalyst that optimizes the very way we develop and construct — helping teams build faster, safer, and more sustainably than ever before.

Our leading-edge Virtual Design and Construction team — led by Amr Raafat, Chief Innovation Officer and Autodesk AEC Innovator of the Year — provides tech-first, real-time solutions to every project challenge, helping us streamline the decision-making process. By combining a broad spectrum of ever-growing technology capabilities, IDEA transforms the way we build by supporting construction processes, design, and engineering partners throughout the project’s life cycle. Windover’s IDEA platform is redefining the possibilities to advance the Architectural, Engineering and Construction industry.

Recognizing AEC Brilliance

Explore the world’s most innovative projects in architecture, engineering and construction.

Learn more about Windover Construction’s global recognition for transforming the industry:

4D Planning

Visual 3D construction and assembly sequences synched to schedule.

Digital Fabrication

Unifying BIM with manufacturing technology to build better.

Virtual & Mixed Reality

Immersive realistic experience for material and change management.

Laser Scanning

Exact spatial data of spaces and elements using reality capture.

Automation

Combining BIM data and robotics to build faster and safer.

Drone Surveys

Aerial reality capture and data-rich modeling.

MEP/BIM Coordination

Optimized BIM-based constructability review, mitigating risk before fabrication.

3D Printing

Redefining possibilities to build elements with BIM and additive manufacturing.

3D Site Logistics

Interactive 3D logistics and safety planning.

3D Maps

Interactive campus maps built with reality capture, GIS and BIM.

WORK WITH US 

Highly collaborative, talented, and passionate employees and trade partners are essential to our success. With projects spanning multiple market sectors, Windover offers diverse career opportunities both in the office and in the field.