Category: Plan & Build

Building at the Speed of Innovation: Automation, Prefabrication, and Beyond

Imagine prefabricating hundreds of trusses in just a few hours. Now, imagine doing so with the highest level of precision, quality, and sustainability. Digital Prefabrication, 3D Printing and Automation are making this a reality for design and construction. Windover is pioneering methods leveraging cutting-edge technologies combined with data acquired from laser scanning and drones to

Read More

ASHRAE Shares Recommendations for Reopening

As our communities begin the process of reopening, we all want to be confident that we are doing everything possible to ensure the safety of those that occupy our spaces. Many of our clients are looking forward to welcoming back students, employees, and families into our buildings and want to ensure the best practices around

Read More

Jon Sawyer’s Showroom Favorites

New year, new renovation? Windover Superintendent, Jon Sawyer, shares his top picks from DesignerBath’s showroom in this recent blog post. Check it out to inspire your next bathroom or kitchen design!

5 Best Practices for Building Quality of Life

The year 2030 marks an important demographic turning point according to the U.S. Census Bureau. By 2030, we can expect all baby boomers to be older than 65; 1 in every 5 residents will be retirement age; population growth will slow; and the old-age dependency ratio will continue to grow. Today more than ever there

Read More

High Humidity & HVAC

Although it may not feel like it, summer is just around the corner and so are those warm days and high humidity levels. Last summer, the Northeast region experienced record-breaking humidity levels due to warmer ocean temperatures on the coast causing unusually high nighttime temperatures. HVAC systems in our region are typically not designed to

Read More

Massachusetts’ New Elevator Code

You may have heard about the new national elevator code, and, if you’re like us, you may also be trying to make heads and tail of it. We tapped Windover’s Manager of MEP Services, Charlie Romano, to explain the new code and how it may affect current projects in construction. What’s New? As of January

Read More

A Design-Build Modular Solution

Over-enrolled and lacking beds, Endicott College turned to Windover to find a solution that would offer on-campus housing for their incoming freshman class. We had nine months to plan and execute before their needed occupancy date. The solution? Windover’s design-build team with partner, SV Design, Siemasko + Verbridge, developed plans for a 225-bed, modular residence hall

Read More