Client:
Tufts University
Location:
Medford, MA
Size:
33,600 SF
Project Type:
New Construction
Services:
Design-build
Architect:
Bergmeyer

Windover led the design-build process to create temporary dorms for Tufts University students while a new permanent dorm was built.  During an eight-month process from design to turnover, Windover delivered 150 beds within three modular fabricated structures while incorporating high efficiency equipment, low flow fixtures, and LED lighting to reach the Tufts’ sustainability goals. Furthering these goals, the modular buildings were built with the intent and ability to be repurposed in the future.

Windover led the design-build process to create temporary dorms for Tufts University students while a new permanent dorm was built.  During an eight-month process from design to turnover, Windover delivered 150 beds within three modular fabricated structures while incorporating high efficiency equipment, low flow fixtures, and LED lighting to reach the Tufts’ sustainability goals. Furthering these goals, the modular buildings were built with the intent and ability to be repurposed in the future.

Join Our Team

Highly collaborative, talented, and passionate employees are essential to our success. With projects spanning multiple market sectors, Windover offers diverse career opportunities both in the office and in the field.